Loading model

Precast drafting
in 1 day, not months.

We’re the drafting subcontractor for structural engineering firms: send the specs, get the full 2D set back — DXF, PDF and IFC.

Elcrete precast hall · 87.5 × 72.5 m · 484 pieces

In production with

Element Construction
Our factory now runs near maximum capacity.
Element Construction
Elcrete
We get 2D drawings in 1 day and each revision takes a few hours.
Elcrete

Demo · Watch it happen

S-200 · Projects

Working documents, not renders

A real project, shown whole — orbit the model, read the sheets.

PRJ-01

Movie Studio

A four-gable studio complex across four 24 m bays — sawtooth roofline, tapered columns, edge beams.

99.5 × 39.5
metres, overall
288
precast pieces placed
13
element types in the library
11
sheets in the GA register
Loading model
Movie Studio · 3D model · 288 piecesDrag to orbit
Foundation plan of the Movie Studio complex, 1:100
S-101 · Foundation plan · 1:100
Erection plan of the Movie Studio complex, Level 1, 1:100
S-201 · Erection plan — Level 1 · 1:100
South elevation of the Movie Studio complex, 1:100
S-401 · South elevation · 1:100

S-400 · Questions

Before you ask

Who’s liable if a drawing is wrong?+

We’re a detailing subcontractor — your engineer reviews and approves, same as with any detailer. Our own structural engineer checks every set first.

Do you work to ACI 318 and PCI standards?+

We detail to ACI 318 and PCI conventions, and our own practicing precast structural engineer reviews every set before it leaves. We have not completed a formal third-party validation of the system. If that matters to you, run a paid pilot on a single element and judge the output against your own standards.

What’s your turnaround on a real project?+

2–5 days for a full building set. Our fastest full package on a 108,000 sq ft warehouse was 21 hours.

What does it cost?+

Priced per project, not per hour. Typically well below domestic detailing rates. Send a project and we’ll quote it in 24 hours.

What if we don’t like the output?+

First project is scoped small deliberately. If the set isn’t usable, you don’t pay for it.

Do we have to change our workflow or software?+

No. You send specs however you send them today. You get DXF, PDF and IFC4 back.

How do we start?+

One project. Small scope. See the output before committing to anything larger.

S-500 · Contact