Drag to orbit — this is a real project, not an illustrationElcrete precast hall · 87.5 × 72.5 m · 484 pieces
In production with
“Our factory now runs near maximum capacity.”
Element Construction
“We get 2D drawings in 1 day and each revision takes a few hours.”
Elcrete
Demo · Watch it happen
S-200 · Projects
Working documents, not renders
A real project, shown whole — orbit the model, read the sheets. The 3D and the drawings are the same data: briefed in conversation, delivered as DXF, PDF and IFC4. The hall orbiting in the cover is another one — 484 pieces, drawn the same way.
PRJ-01
Movie Studio
A four-gable studio complex across four 24 m bays — sawtooth roofline, tapered columns, edge beams. Delivered as a full GA register, foundation plan through elevations and sections.
99.5 × 39.5
metres, overall
288
precast pieces placed
13
element types in the library
11
sheets in the GA register
Loading model
Movie Studio · 3D model · 288 piecesDrag to orbitS-101 · Foundation plan · 1:100
S-201 · Erection plan — Level 1 · 1:100S-401 · South elevation · 1:100
S-400 · Questions
Before you ask
Who’s liable if a drawing is wrong?+
We’re a detailing subcontractor — your engineer reviews and approves, same as with any detailer. Our own structural engineer checks every set first.
Do you work to ACI 318 and PCI standards?+
We detail to ACI 318 and PCI conventions, and our own practicing precast structural engineer reviews every set before it leaves. We have not completed a formal third-party validation of the system. If that matters to you, run a paid pilot on a single element and judge the output against your own standards.
What’s your turnaround on a real project?+
2–5 days for a full building set. Our fastest full package on a 108,000 sq ft warehouse was 21 hours.
What does it cost?+
Priced per project, not per hour. Typically well below domestic detailing rates. Send a project and we’ll quote it in 24 hours.
What if we don’t like the output?+
First project is scoped small deliberately. If the set isn’t usable, you don’t pay for it.
Do we have to change our workflow or software?+
No. You send specs however you send them today. You get DXF, PDF and IFC4 back.
How do we start?+
One project. Small scope. See the output before committing to anything larger.